STEEL ERECTION

Whether it’s a raising gang on a building or a crane rail change out in an existing facility, Marriott Construction Ltd’ experienced ironworkers and operators can handle the job.

With our experience, commitment, and quality, Marriott Construction Ltd is prepared to safely execute and design engineered lifts. Marriott Construction Ltd Checks everything from operator qualifications and crane inspections, to weather and rigging.

Steel erection is all about the safe and efficient movement of iron and disciplined detailing all the while engineering safety into those activities.

Marriott Construction Ltd strictly abides by a zero-accident policy. Every construction site utilized by Marriott Construction Ltd is a completely safe working environment.

If you need Steel Erection for your next industrial project, click the link below to receive a quote from Marriott Construction Ltd Industrial Engineers and Constructors.

Get a Quote

PROJECTS

  • HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    Steel Erection
  • ALLEGHENY ENERGY
    ALLEGHENY ENERGY
    Steel Erection
  • ATI VANDERGRIFT
    ATI VANDERGRIFT
    Steel Erection
×
Hammond
Hammond
HAMMOND SPORTSPLEX AND COMMUNITY CENTER

Location: Hammond, Indiana

Marriott Construction Ltd erected structural steel, joists and decking for a 135,000 square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields and six batting cages. The facility also contains an upper level track that can be used for running and walking, as well as to observe sporting events. The erection of this facility began in September 2017 and was completed in January 2018. Structural steel components were provided by Wilson Iron Works, a local fabrication shop.

Categories :
Steel Erection
×
ALLEGHENY ENERGY

Location: Springdale, Pennsylvania

Marriott Construction Ltd Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by Marriott Construction Ltd included the following:

Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building

Also included in the scope of work for this project were extensive excavation and foundation installation.

With safety and efficiency in mind, Marriott Construction Ltd had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. Marriott Construction Ltd takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete this part of the project in a timely and safe manner.

Categories :
Steel Erection
×
ATIVander
ATIVander
ATI VANDERGRIFT

Location: Vandergrift, Pennsylvania

Using various acids for the finishing steel, ATI needed to install a waste acid neutralizing facility. Marriott Construction Ltd performed all of the civil, steel erection and equipment setting.

Some of the work we completed included:

  • Waste Acid Neutralization – civil, steel erection, equipment setting
  • Concrete Work
    • Clarifier Foundations
    • Lime Silo Foundations
    • WWT Building Foundations
  • Tank Pads
  • Steel Work
    • WWT BuildingW
    • WT MezzanineLime
    • Silo (Erection)
    • Miscellaneous Platforms
    • Clarifier (Rubber Lined)

Piping and electrical work were subcontracted to others.

Categories :
Steel Erection
  • HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    Steel Erection
  • ALLEGHENY ENERGY
    ALLEGHENY ENERGY
    Steel Erection
×
Hammond
Hammond
HAMMOND SPORTSPLEX AND COMMUNITY CENTER

Location: Hammond, Indiana

Marriott Construction Ltd erected structural steel, joists and decking for a 135,000 square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields and six batting cages. The facility also contains an upper level track that can be used for running and walking, as well as to observe sporting events. The erection of this facility began in September 2017 and was completed in January 2018. Structural steel components were provided by Wilson Iron Works, a local fabrication shop.

Categories :
Steel Erection
×
ALLEGHENY ENERGY

Location: Springdale, Pennsylvania

Marriott Construction Ltd Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by Marriott Construction Ltd included the following:

Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building

Also included in the scope of work for this project were extensive excavation and foundation installation.

With safety and efficiency in mind, Marriott Construction Ltd had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. Marriott Construction Ltd takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete this part of the project in a timely and safe manner.

Categories :
Steel Erection
  • ATI VANDERGRIFT
    ATI VANDERGRIFT
    Steel Erection
×
ATIVander
ATIVander
ATI VANDERGRIFT

Location: Vandergrift, Pennsylvania

Using various acids for the finishing steel, ATI needed to install a waste acid neutralizing facility. Marriott Construction Ltd performed all of the civil, steel erection and equipment setting.

Some of the work we completed included:

  • Waste Acid Neutralization – civil, steel erection, equipment setting
  • Concrete Work
    • Clarifier Foundations
    • Lime Silo Foundations
    • WWT Building Foundations
  • Tank Pads
  • Steel Work
    • WWT BuildingW
    • WT MezzanineLime
    • Silo (Erection)
    • Miscellaneous Platforms
    • Clarifier (Rubber Lined)

Piping and electrical work were subcontracted to others.

Categories :
Steel Erection
  • HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    HAMMOND SPORTSPLEX AND COMMUNITY CENTER
    Steel Erection
×
Hammond
Hammond
HAMMOND SPORTSPLEX AND COMMUNITY CENTER

Location: Hammond, Indiana

Marriott Construction Ltd erected structural steel, joists and decking for a 135,000 square-foot complex. This complex features six basketball courts, twelve volleyball courts, two regulation-size indoor soccer fields and six batting cages. The facility also contains an upper level track that can be used for running and walking, as well as to observe sporting events. The erection of this facility began in September 2017 and was completed in January 2018. Structural steel components were provided by Wilson Iron Works, a local fabrication shop.

Categories :
Steel Erection
  • ALLEGHENY ENERGY
    ALLEGHENY ENERGY
    Steel Erection
×
ALLEGHENY ENERGY

Location: Springdale, Pennsylvania

Marriott Construction Ltd Engineers & Constructors, as a subcontractor to Black & Veatch, erected five separate buildings for a combined cycle facility located in Springdale, Pennsylvania. The specific structures that were erected by Marriott Construction Ltd included the following:

Control Building
Generation Building
Combustion Turbine Building
Water Treatment Building
Pump Building

Also included in the scope of work for this project were extensive excavation and foundation installation.

With safety and efficiency in mind, Marriott Construction Ltd had our wholly owned subsidiary, CDMG, design an adjustable spreader beam to lift and set the bridge tress that was assembled on the ground. Marriott Construction Ltd takes pride in being able to utilize the various talents within our family of companies. Due to this ability, we were able to complete this part of the project in a timely and safe manner.

Categories :
Steel Erection
  • ATI VANDERGRIFT
    ATI VANDERGRIFT
    Steel Erection
×
ATIVander
ATIVander
ATI VANDERGRIFT

Location: Vandergrift, Pennsylvania

Using various acids for the finishing steel, ATI needed to install a waste acid neutralizing facility. Marriott Construction Ltd performed all of the civil, steel erection and equipment setting.

Some of the work we completed included:

  • Waste Acid Neutralization – civil, steel erection, equipment setting
  • Concrete Work
    • Clarifier Foundations
    • Lime Silo Foundations
    • WWT Building Foundations
  • Tank Pads
  • Steel Work
    • WWT BuildingW
    • WT MezzanineLime
    • Silo (Erection)
    • Miscellaneous Platforms
    • Clarifier (Rubber Lined)

Piping and electrical work were subcontracted to others.

Categories :
Steel Erection