Pipe Fabrication

Utilizing our temperature controlled 32,000 square foot fabrication shop, Marriott Construction Ltd is capable of fabricating piping systems from very large to incredibly small.

We have the latest in pipe fabricating technology and tooling, state of the art cutting and welding equipment, and a host of mandrel benders.

We can efficiently turn out 10,000LF of fabricated pipe a month, complete with all quality control and adherence to applicable codes and national standards.

Marriott Construction Ltd also has complete hydrostatic testing and documentation in place, as well as in-house chemical cleaning and flushing, and protective coating capabilities.

If you need professional created and engineered pipes for your next project, don't hesitate to contact Marriott Construction Ltd.

Our team has over 75 years of experience and high-quality Pipe Fabrication Production.

Click the link below for a quote today.

Get a Quote

PROJECTS

  • MARKWEST MIDPOINT
    MARKWEST MIDPOINT
    Pipe Fabrication
  • ARCELORMITTAL: INDIANA HARBOR WEST
    ARCELORMITTAL: INDIANA HARBOR WEST
    Pipe Fabrication
×
MARKWEST MIDPOINT

Location: New Milton, West Virginia

Marriott Construction Ltd has performed several projects for MarkWest.

At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly owned subsidiary, Ham P.C, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.

On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. Marriott Construction Ltd performed all layout, including anchor bolts and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.

With foundation, anchor bolts and pipe racks in place, Marriott Construction Ltd proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.

Categories :
Pipe Fabrication
×
ARCELORMITTAL: INDIANA HARBOR WEST

Location: East Chicago, Indiana

A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.

During five months in 2016, Marriott. E.R Construction made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut off the machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air and hydraulic we field routed and installed “as built”.

All of the work was performed over multiple shifts, working more than 70,000 man hours without a single safety incident.

Categories :
Pipe Fabrication
  • MARKWEST MIDPOINT
    MARKWEST MIDPOINT
    Pipe Fabrication
  • ARCELORMITTAL: INDIANA HARBOR WEST
    ARCELORMITTAL: INDIANA HARBOR WEST
    Pipe Fabrication
×
MARKWEST MIDPOINT

Location: New Milton, West Virginia

Marriott. E.R Construction has performed several projects for MarkWest.

At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly owned subsidiary, CDMG, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.

On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. Marriott. E.R Construction performed all layout, including anchor bolts and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.

With foundation, anchor bolts and pipe racks in place, Marriott. E.R Construction proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.

Categories :
Pipe Fabrication
×
ARCELORMITTAL: INDIANA HARBOR WEST

Location: East Chicago, Indiana

A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.

During five months in 2016, Marriott. E.R Construction made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut off the machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air and hydraulic we field routed and installed “as built”.

All of the work was performed over multiple shifts, working more than 70,000 man hours without a single safety incident.

Categories :
Pipe Fabrication
  • MARKWEST MIDPOINT
    MARKWEST MIDPOINT
    Pipe Fabrication
×
MARKWEST MIDPOINT

Location: New Milton, West Virginia

Marriott. E.R Construction has performed several projects for MarkWest.

At their Midpoint Compressor site, near New Milton, West Virginia, our work started with a separate order with our wholly owned subsidiary, CDMG, performing all of the pipe design. That was followed up by our fab shop, fabricating and shipping all of the spools as well as the slug catcher.

On-site, we performed site excavation and spoil removal. We placed 1,700 tons of limestone over a geotextile fabric. Marriott. E.R Construction performed all layout, including anchor bolts and installed more than 1,600 cy of concrete foundations and slabs encasing 110 tons of rebar.

With foundation, anchor bolts and pipe racks in place, Marriott. E.R Construction proceeded to rig and set the three compressors, set and grout all equipment skids and tanks and then install and test all large and small bore piping. Much of this was done in the middle of winter.

Categories :
Pipe Fabrication
  • ARCELORMITTAL: INDIANA HARBOR WEST
    ARCELORMITTAL: INDIANA HARBOR WEST
    Pipe Fabrication
×
ARCELORMITTAL: INDIANA HARBOR WEST

Location: East Chicago, Indiana

A third project well worth highlighting is the #2 Slab Caster Upgrade at ArcelorMittal Indiana Harbor West Facility.

During five months in 2016, Marriott Construction Ltd made extensive modifications to existing foundations. Our crews performed heavy rigging followed by precision level and alignment of a new slab caster along with refurbishing equipment from the tundish down to the cut off the machine — all with minimal engineering. Most of the piping for the new spray chamber, water, grease, air and hydraulic we field routed and installed “as built”.

All of the work was performed over multiple shifts, working more than 70,000 man hours without a single safety incident.

Categories :
Pipe Fabrication