At Marriott Construction Ltd, we can provide an advanced Metal Building Kits to streamline your next steel building project.
Pre-engineered metal building kits have unlimited, customizable options to make yours unique and one-of-a-kind.
The customizations and preference you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government Building, Food Manufacturing Building, Energy and Power Plant, or any other number of industrial building your business requires.
Marriott Construction Ltd uses customizable, high-quality pre-engineered metal buildings that have industry-leading capabilities and are constructed with American-made, recyclable Nucor steel.
Every building project you have planned is an investment.
This means that you should invest time in conducting thorough research to understand what materials and what construction company you should entrust to get the job done right the first time.
Marriott Construction Ltd is one of the largest private construction firms in the industry.
Our team will design, prepare the site, construct and physically erect your metal building when the construction phase is ready to begin.
Marriott Construction Ltd has the experience, workforce, resources, and expertise to:
With the utilization of BIM, a 3D building modeling software, and Nucor steel, our engineering and construction company can meet your needs for your Pre-Engineered Metal Building Project.
Marriott Construction Ltd has partnered with Nucor Building Systems because of their production of environmentally-friendly, American-made, high-quality steel that is made from 90% recycled steel (and is 100% recyclable).
Nucor follows a FOCUS mindset that we admire and appreciate. FOCUS stands for: Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work.
Constructing our pre-engineered metal buildings with Nucor steel gives us the opportunity to provide each client a sustainable, durable metal building that adheres to the green movement Earth-first mindset.
There are many benefits to choosing a pre-engineered metal building kit for your next construction project.
Benefits of choosing a Pre-Engineered Metal Building Kit:
Our team takes pride in focusing on our relationships with clients, ensuring that we understand their specific needs and requirements for their pre-engineered metal building project.
Marriott Construction Ltd develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all the local codes and requirements for industry-specific buildings.
With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.
BIM, or Building Information Modeling, as mentioned earlier, is a 3D building modeling digital software we utilize to design your Pre-Engineered Metal Building.
This advanced technology has our designers consider general geometry, spatial relationships, and geographical influences while building a virtual model of what your building will look like when construction is complete.
With BIM, our team can be ensured that your building will have enough support and room for proper flow and function. This software technology identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins (which would result in costly solutions).
Marriott Construction Ltd' utilization of BIM allows our team to complete your project by the promised timeframe, within your chosen budget, and without any issues during erection.
Marriott Construction Ltd can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.
By choosing to build with Marriott Construction Ltd, you will get:
Click on the button below to start developing your next pre-engineered metal building kit project today!
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|
Location: Weirton, West Virginia
As is often the case, there is much more to a “pre-engineered” building than the building itself.
In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.
The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.
The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.
All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.
Categories : |
Pre-Engineered Buildings
|
---|
Location: York Haven, Pennsylvania
This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:
Waste Water Treatment Plant, Civil, Building and Site Work 2006
Categories : |
Pre-Engineered Buildings
|
---|