Backed by over the years of experience, commitment and quality, the Marriott Construction Ltd family of companies strives to be the preferred industrial engineer and constructor of choice.
The Company offers services including design, Engineering Services project management, planning, procurement, and programming.
"Marriott Construction Ltd" provides construction services to oil and gas, Industrials Engineering & Mechanized farming Pharmaceutical Product, power generation, nuclear, defense, and water/mining industries.
Marriott Construction Ltd are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale.
Our skillset includes:
Relocating Utilities
Backfill
De-Watering
Foundation work
Clearing land
Grading
Driveways
Walkways
Excavation
Septic and Sewer Systems
Permitting and more
We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.
One of the classical site work and excavation projects in Marriott Construction Ltd' portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.
Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.
A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. Marriott Construction Ltd worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.
To learn how Marriott Construction Ltd can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.
Categories : |
Kinder Morgan
|
---|
Marriott Construction Ltd has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.
Marriott Construction Ltd completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.
In one of our exemplary Sheet & H-pile projects, Marriott Construction Ltd installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices.
We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.
We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.
Categories : |
Williams Union Boiler
|
---|
Marriott Construction Ltd is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients.
We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.
One exceptional civil concrete project that Marriott Construction Ltd handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile.
The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours and injecting the pour site with liquid nitrogen.
In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.
Categories : |
PPL BRUNNER ISLAND
|
---|
As one of the most hazardous construction occupations in the U.S., Marriott Construction Ltd takes extensive measures to ensure the safety of all crew members on a steel erection project.
We prioritize safety while adhering to the highest standards for efficiency and quality.
In a showcase steel erection project, Marriott Construction Ltd subcontracted with Black & Veatch, to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations.
A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. Marriott Construction Ltd adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on-time.
Categories : |
Allegheny Energy
|
---|
Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. Marriott Construction Ltd brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible.
Our experienced riggers take time to understand the unique challenges of your project and work tirelessly to ensure your project plan is completed safely and on-time.
Our Fort Beeler contract was a classic heavy rigging undertaking for Marriott Construction Ltd. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications.
We also completed hydro-excavating, installed 1,000 cy of concrete and fabricated and installed 100 tons of steel.
Marriott Construction Ltd coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction.
Marriott Construction Ltd offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.
Categories : |
Fort Beeler
|
---|
Marriott Construction Ltd has decades of experience completing equipment setting and precision alignment projects for industrial clients.
We are driven by a passion for helping expanding businesses meet their growing client demands.
Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.
We are also committed to responsive, clear communication and the highest standards for safety and efficiency to minimize process line shutdown time during construction.
Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.
Marriott Construction Ltd showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations.
Our scope of work involved:
Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease
Marriott. E.R Construction utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines.
Categories : |
Foundation Modification and Installation
|
---|
Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization.
Marriott Construction Ltd is proud to offer high-quality, pre-engineered steel buildings through our wholly owned subsidiary, Ham P.C, a manufacturer's representative from Nucor Building Systems.
Ham P.C helps clients customize their facility to suit their exact needs, and Marriott Construction Ltd builds the facility for longevity and function.
In a showcase project of our metal building capabilities, Marriott Construction Ltd completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.
Our scope of work also included:
Geotechnical reports
Spread footers
Grade Walls
23,000 square feet of floor slab
1000 feet of stormwater piping
Electrical
HVAC
Fire protection
Permitting
We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.
Learn how Marriott. E.R Construction can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.
Categories : |
Precoat Metals
|
---|
From our in-house, 32,000 square foot fabrication shop, Marriott Construction Ltd has the capacity to produce 10,000LF of pipe each month in a variety of sizes.
We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.
We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.
One of Marriott Construction Ltd' pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.
Over five months, Marriott Construction Ltd scope of work included:
Learn how Marriott Construction Ltd can leverage our capabilities to benefit your pipe fabrication project.
Categories : |
ArcelorMittal - Indiana Harbor West
|
---|
Marriott Construction Ltd Engineers & Constructors takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.
In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.
For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, Marriott Construction Ltd implemented a variety of pipes including:
All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.
Learn more about Marriott Construction Ltd Pipe Installation capabilities for your upcoming project.
Categories : |
Burns Harbor
|
---|
Marriott Construction Ltd & constructors are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale.
Our skillset includes:
Relocating Utilities
Backfill
De-Watering
Foundation work
Clearing land
Grading
Driveways
Walkways
Excavation
Septic and Sewer Systems
Permitting and more
We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.
One of the classical site work and excavation projects in Marriott Construction Ltd' portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.
Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.
A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. Marriott Construction Ltd worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.
To learn how Marriott Construction Ltd can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.
Categories : |
Kinder Morgan
|
---|
Marriott Construction Ltd has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.
Marriott Construction Ltd completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.
In one of our exemplary Sheet & H-pile projects, Ham P.C InternationalS installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices.
We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.
We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.
Categories : |
Williams Union Boiler
|
---|
Marriott Construction Ltd is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients.
We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.
One exceptional civil concrete project that Marriott Construction Ltd handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile.
The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours and injecting the pour site with liquid nitrogen.
In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.
Categories : |
PPL BRUNNER ISLAND
|
---|
As one of the most hazardous construction occupations in the U.S., Marriott Construction Ltd takes extensive measures to ensure the safety of all crew members on a steel erection project.
We prioritize safety while adhering to the highest standards for efficiency and quality.
In a showcase steel erection project, Marriott Construction Ltd subcontracted with Black & Veatch, to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations.
A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. Marriott Construction Ltd adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on-time.
Categories : |
Allegheny Energy
|
---|
Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. Marriott Construction Ltd brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible.
Our experienced riggers take time to understand the unique challenges of your project and work tirelessly to ensure your project plan is completed safely and on-time.
Our Fort Beeler contract was a classic heavy rigging undertaking for Marriott Construction Ltd. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications.
We also completed hydro-excavating, installed 1,000 cy of concrete and fabricated and installed 100 tons of steel.
Marriott Construction Ltd coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction.
Marriott Construction Ltd offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.
Categories : |
Fort Beeler
|
---|
Marriott Construction Ltd has decades of experience completing equipment setting and precision alignment projects for industrial clients.
We are driven by a passion for helping expanding businesses meet their growing client demands.
Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.
We are also committed to responsive, clear communication and the highest standards for safety and efficiency to minimize process line shutdown time during construction.
Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.
Marriott Construction Ltd showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations.
Our scope of work involved:
Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease
Marriott. E.R Construction utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines.
Categories : |
Foundation Modification and Installation
|
---|
Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization.
Marriott Construction Ltd is proud to offer high-quality, pre-engineered steel buildings through our wholly owned subsidiary, Ham P.C, a manufacturer's representative from Nucor Building Systems.
Ham P.C helps clients customize their facility to suit their exact needs, and Ham P.C Internationalbuilds the facility for longevity and function.
In a showcase project of our metal building capabilities, Marriott Construction Ltd completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.
Our scope of work also included:
Geotechnical reports
Spread footers
Grade Walls
23,000 square feet of floor slab
1000 feet of stormwater piping
Electrical
HVAC
Fire protection
Permitting
We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.
Learn how Marriott. E.R Construction can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.
Categories : |
Precoat Metals
|
---|
From our in-house, 32,000 square foot fabrication shop, Marriott Construction Ltd has the capacity to produce 10,000LF of pipe each month in a variety of sizes.
We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.
We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.
One of Marriott Construction Ltd pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.
Over five months, Marriott Construction Ltd scope of work included:
Learn how Marriott. E.R Construction can leverage our capabilities to benefit your pipe fabrication project.
Categories : |
ArcelorMittal - Indiana Harbor West
|
---|
Marriott Construction Ltd Engineers & Constructors takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.
In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.
For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, Marriott Construction Ltd implemented a variety of pipes including:
All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.
Learn more about Marriott Construction Ltd Pipe Installation capabilities for your upcoming project.
Categories : |
Burns Harbor
|
---|
Marriott Construction Ltd & constructors are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale.
Our skillset includes:
Relocating Utilities
Backfill
De-Watering
Foundation work
Clearing land
Grading
Driveways
Walkways
Excavation
Septic and Sewer Systems
Permitting and more
We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.
One of the classical site work and excavation projects in Marriott Construction Ltd portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.
Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.
A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. Marriott Construction Ltd worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.
To learn how Marriott Construction Ltd can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.
Categories : |
Kinder Morgan
|
---|
Marriott Construction Ltd has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.
Marriott Construction Ltd completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.
In one of our exemplary Sheet & H-pile projects, Marriott Construction Ltd installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices.
We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.
We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.
Categories : |
Williams Union Boiler
|
---|
Marriott Construction Ltd is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients.
We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.
One exceptional civil concrete project that Marriott Construction Ltd handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile.
The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours and injecting the pour site with liquid nitrogen.
In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.
Categories : |
PPL BRUNNER ISLAND
|
---|
As one of the most hazardous construction occupations in the U.S., Marriott Construction Ltd takes extensive measures to ensure the safety of all crew members on a steel erection project.
We prioritize safety while adhering to the highest standards for efficiency and quality.
In a showcase steel erection project, Marriott Construction Ltd subcontracted with Black & Veatch, to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations.
A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. Marriott Construction Ltd adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on-time.
Categories : |
Allegheny Energy
|
---|
Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. Marriott Construction Ltd brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible.
Our experienced riggers take time to understand the unique challenges of your project and work tirelessly to ensure your project plan is completed safely and on-time.
Our Fort Beeler contract was a classic heavy rigging undertaking for Marriott Construction Ltd. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications.
We also completed hydro-excavating, installed 1,000 cy of concrete and fabricated and installed 100 tons of steel.
Marriott. E.R Construction coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction.
Marriott. E.R Construction offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.
Categories : |
Fort Beeler
|
---|
Marriott Construction Ltd has decades of experience completing equipment setting and precision alignment projects for industrial clients.
We are driven by a passion for helping expanding businesses meet their growing client demands.
Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.
We are also committed to responsive, clear communication and the highest standards for safety and efficiency to minimize process line shutdown time during construction.
Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.
Marriott Construction Ltd showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations.
Our scope of work involved:
Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease
Marriott Construction Ltd utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines.
Categories : |
Foundation Modification and Installation
|
---|
Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization.
Marriott Construction Ltd is proud to offer high-quality, pre-engineered steel buildings through our wholly owned subsidiary, Ham P.C, a manufacturer's representative from Nucor Building Systems.
Ham P.C helps clients customize their facility to suit their exact needs, and Marriott Construction Ltd builds the facility for longevity and function.
In a showcase project of our metal building capabilities, Marriott Construction Ltd completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.
Our scope of work also included:
Geotechnical reports
Spread footers
Grade Walls
23,000 square feet of floor slab
1000 feet of stormwater piping
Electrical
HVAC
Fire protection
Permitting
We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.
Learn how Ham P.C InternationalS can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.
Categories : |
Precoat Metals
|
---|
From our in-house, 32,000 square foot fabrication shop, Marriott Construction Ltd has the capacity to produce 10,000LF of pipe each month in a variety of sizes.
We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.
We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.
One of Marriott Construction Ltd pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.
Over five months, Marriott Construction Ltd scope of work included:
Learn how Marriott Construction Ltd can leverage our capabilities to benefit your pipe fabrication project.
Categories : |
ArcelorMittal - Indiana Harbor West
|
---|
Marriott Construction Ltd takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.
In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.
For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, Marriott Construction Ltd implemented a variety of pipes including:
All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.
Learn more about Marriott Construction Ltd Pipe Installation capabilities for your upcoming project.
Categories : |
Burns Harbor
|
---|
Marriott Construction Ltd performed a very difficult earth moving project for the Utopia Pipeline successfully. Steep terrain, sensitive environmental areas, and several air bridges were built across multiple pipelines to safely move dirt from one area to another. All work was done safely and without incident. All personnel were professional and adapted to the changing weather and site conditions very well.
Crucial to our future in the specialty steel industry, Marriott Construction Ltd’ work to improve our process line and tank farms for J&L Specialty Steel’s DRAP Pre-pickling Project is better than we had hoped. We’re impressed with the outcome and look forward to working together on future projects.
Just wanted to give a heads up to you on the great job done by Marriott Construction Ltd on our Lime Containment project. Big thanks to Kevin, Andy, Carey and Wayne for their hard work and commitment to keeping it a safe worksite. Hope to work with you and them again in the future.